top of page

New road opens in Bedfordshire as part of National Highways major scheme

  • Writer: Safer Highways
    Safer Highways
  • 3 hours ago
  • 3 min read

A key milestone was reached today on National Highways’ major road scheme in Bedfordshire with the opening of a new road that promises to improve safety and connectivity for local residents and communities.


The newly opened Baron Way and Dove Farm Lane provides a vital new link between Roxton Road and The Lane in Wyboston, creating safer access to the A1/A421 Black Cat roundabout. It will also pick up traffic from Nagshead Lane and Chawston Lane.


The new road forms part of the wider upgrade to one of the region’s most important transport routes between Black Cat roundabout in Bedfordshire and Caxton Gibbet roundabout in Cambridgeshire – providing quicker, safer, and more reliable journeys.


Baron Way was named in honour of the last family to reside in the nearby Brook Cottages, while Dove Farm Lane derived its name from the adjacent farm.


Lee Galloway, National Highways Project Director, said: “The opening of this new road is a significant step forward for our scheme and will make a real difference to people living and working in the area. By providing this new connection, we are improving safety and creating a more reliable link for drivers heading towards the Black Cat roundabout.”


As part of this change, National Highways will permanently  close the direct access points from The Lane, Nagshead Lane, and Chawston Lane onto the A1 northbound. These junctions were previously identified as a safety risk due to their layout, which required vehicles to merge directly from local roads into fast-moving traffic on the A1.


Lee added: “This is the one of many milestones to come as our work continues building a new dual carriageway and junction upgrades that will connect communities, unlock economic opportunities, and make every day travel quicker, safer, and more reliable for thousands of people.”


Tom Wootton, Mayor of Bedford Borough said: “This is another significant step forward in the investment across our borough.


“Residents, commuters and visitors will all benefit from this road, this forms part of the £1billion-worth of improvements which are being made across this project.”


The opening of Dove Farm Lane and Baron Way follows the opening of the new Roxton Road bridge in early May. The new bridge has been purpose-built to accommodate new westbound slip road and an eastbound free-flow link between the A421 and the A1. These upgraded links will deliver faster, safer, and more reliable journeys through Black Cat roundabout for all road users.

National Highway’s £1 billion scheme to upgrade the route between Black Cat roundabout and Caxton Gibbet roundabout started construction in late 2023.


The scheme will see the creation of a 10-mile dual carriageway linking the A1/A421 Black Cat roundabout with the A428 Caxton Gibbet roundabout. Both existing roundabouts will be upgraded into modern, free-flowing junctions. A new junction will also be added at Cambridge Road, improving access to St Neots and its train station.


This new dual carriageway will replace the final stretch of single carriageway on the strategic road network between the M1 at Milton Keynes and the east coast ports of Harwich and Felixstowe.

At peak times, drivers will save up to 10 minutes per journey – adding up to 1.5 hours every working week – helping to support regional growth, ease congestion, and make travel more reliable.


The scheme is expected to open to traffic in spring 2027.   


 
 
 

Comments


Recent Blog Posts

NEWS AND UPDATES

bottom of page