top of page
  • Writer's pictureSafer Highways

HS2 trials ‘first of a kind’ electric drilling rig in bid to cut carbon in construction


The world’s first fully electric high-capacity piling rig is being put to work on HS2’s construction site in Warwickshire as a carbon cutting measure.


HS2 Ltd’s construction partner Balfour Beatty VINCI Joint Venture (BBV), is currently trialling the world’s first all-electric, high-capacity drilling rig on a construction site in Warwickshire, as the Joint Venture steps up its plans to meet HS2 Ltd’s ambition for diesel-free construction sites.


Andrea Davidson, HS2’s Air Quality Manager said:

“We are proud to be working with our supply chain and leading manufacturers to drive a step change in the UK construction industry, demonstrating the viability and benefits of emissions-free heavy electric plant.


“Being at the forefront of a ground-breaking trial like this is another step on our journey to achieving our target of all diesel-free construction sites by 2029, and net zero carbon from 2035 – helping HS2 to become the most sustainable infrastructure project ever delivered.”


The 100 tonne BAUER eBG33 drilling rig creates an overall reduction of 1292kg CO2 per day compared to a traditionally powered rig and also reduces noise by 50%. In terms of performance, the rig is able to carry out exactly the same tasks as a traditional rig.











32 views0 comments

Comentarios


Recent Blog Posts

NEWS AND UPDATES

bottom of page